4G Smart GPS Dog Tracker with Real-Time Location, Virtual Fence & Activity Monitoring, Waterproof Long Battery Life, Chew-Resistant Design with 3 Protective Shells, App & Subscription Required

4G Smart GPS Dog Tracker with Real-Time Location, Virtual Fence & Activity Monitoring, Waterproof Long Battery Life, Chew-Resistant Design with 3 Protective Shells, App & Subscription Required

$65.98 USD
Sale price  $65.98 USD Regular price 
Skip to product information
4G Smart GPS Dog Tracker with Real-Time Location, Virtual Fence & Activity Monitoring, Waterproof Long Battery Life, Chew-Resistant Design with 3 Protective Shells, App & Subscription Required

4G Smart GPS Dog Tracker with Real-Time Location, Virtual Fence & Activity Monitoring, Waterproof Long Battery Life, Chew-Resistant Design with 3 Protective Shells, App & Subscription Required

$65.98 USD
Sale price  $65.98 USD Regular price 
Shipping calculated at checkout.

About This

  • REAL-TIME GPS TRACKING (OUTDOOR USE) Track your dog’s live location outdoors with 4G GPS updates every 3-4 seconds. Works anywhere with mobile network coverage for unlimited-distance tracking worldwide.
  • VIRTUAL FENCE & ACTIVITY MONITORING Set safe zones and receive instant alerts if your dog leaves the area. Monitor your dog’s daily activity and overall wellness via the companion app. Receive notifications for unusual behaviour and maintain a healthy routine—all in one place.
  • LONG-LASTING BATTERY & 100% WATERPROOF Durable, waterproof design suitable for outdoor adventures and daily wear. Ideal for rain, mud, or off-leash activities. Battery life lasts up to 30 days.
  • UNIQUE INTERCHANGEABLE PROTECTIVE SHELLS Comes with 3 stylish interchangeable protective shells for enhanced durability and DIY customisation. Replace a chewed shell or swap designs anytime for a personalised look.
  • SUBSCRIPTION & RISK-FREE TRIAL Subscription covers all costs for the built-in SIM and unlimited data, starting at $4.99/month. Enjoy a 3-day free plan and a 90-day money-back guarantee, giving peace of mind while keeping your dog tracked and safe

Overview

  • Brand : HIPET
  • Special Feature : Geo-Fence, Real Time Tracking
  • Connectivity Technology : Cellular
  • Supported Application : Companion App
  • Specific Uses For Product : Outdoor